CASE STUDIES

CASE STUDY
INTERCONTINENTAL HOTELS GROUP
InterContinental London Park Lane required a conveyor system that was able to handle in the region 3000 items in their uniform room, whilst generating more available space to allow for the sorting of garments.

INSTALLATION
ABERDEEN EXHIBITION & CONFERENCE CENTRE
Metalprogetti UK has installed a new state-of-the-art cloakroom facility for Aberdeen Exhibition & Conference Centre.

INSTALLATION
DEPOP
Depop opened a pop-up shop inside iconic department store, Selfridges, which boasted a Metalprogetti kinetic rail that customers could control in order to view the available pieces.

CASE STUDY
THE STANDARD HOTEL
The Standard’s brand new 5-star hotel, located in the heart of London’s Kings Cross, required a uniform conveyor solution to efficiently store and manage staff uniforms.

CASE STUDY
NATURAL HISTORY MUSEUM
Natural History Museum approached Metalprogetti UK looking for a system that could store and manage visitor coats.

INSTALLATION
COACH
Coach needed that ‘wow’ factor for the reopening of their flagship store in London’s prestigious Regent Street; something dynamic, automated and not static.

CASE STUDY
NOBU HOTEL LONDON MAYFAIR
Based on Nobu’s requirements, Metalprogetti UK identified the B2K Smart Locker as the most appropriate solution. It’s incredibly simple to operate, fast and easy to load and offload garments.

CASE STUDY
HUG
Hôpitaux Universitaires de Genève (HUG) required a fully automated system that could withstand the thousands of uniform items being processed in the hospital each day.
CONTACT
US
OUR ADDRESS
9 Marlin Park, Central Way
Feltham, Middlesex
TW14 0AN, UK
​