top of page
CASE STUDY
HUG
Hôpitaux Universitaires de Genève (HUG) required a fully automated system that could withstand the thousands of uniform items being processed in the hospital each day.
CASE STUDY
NOBU HOTEL LONDON MAYFAIR
Based on Nobu’s requirements, Metalprogetti UK identified the B2K Smart Locker as the most appropriate solution. It’s incredibly simple to operate, fast and easy to load and offload garments.
CASE STUDY
INTERCONTINENTAL HOTELS GROUP
InterContinental London Park Lane required a conveyor system that was able to handle in the region 3000 items in their uniform room, whilst generating more available space to allow for the sorting of garments.
GALLERY
RECENT PROJECTS
CONTACT
US
OUR ADDRESS
bottom of page