top of page

A London 5 Star Hotel Metalprogetti Install - In Progress

  • Apr 19
  • 1 min read

We don't usually show our working. But this one's too good not to share.A full Metalprogetti automated uniform system is currently being installed in the basement of one of London's newest five-star hotels - and the scale of what's taking shape is impressive even mid-build.


Conveyor tracks, dispatch units, control panels - all coming together piece by piece beneath one of the city's most anticipated hotel openings.We'll share the full case study once the install is complete. For now, here's a look behind the scenes.



 
 
 

Recent Posts

See All
bottom of page